Installation of a second electrical panel for critical loads
Compensate for frequent power outages
| Project Details | |
|---|---|
| Type of home | Cottage |
| Square footage | 1,800 sq. ft. |
| Service entrance | 200 amp |
| Heating | Electric |
| Water heater | Electric |
| Water supply | Well and pump |
| Time needed for the installation | 2 to 3 weeks |
| Budget (investment) | $35,000 |
| Challenges and accomplishments | Panels installed on a very steep-sloped roof |
| Equipment installed | - 20 400-w panels - 1 6-kW inverter - 1 10-kWh battery |